Apstra DCD Server Upgrade Workflow
| Stage | Description |
|---|---|
| Pre-Upgrade Validation |
|
| Upgrade Apstra DCD Server |
|
| Upgrade Agents |
|
| Upgrade Worker Nodes (Apstra DCD Cluster only) |
For new VMs as worker nodes, import the state from the new controller. |
| Upgrade Device NOS, as needed | Upgrade your devices to a qualified NOS version if their current versions are not compatible with the new Apstra DCD version (see the Apstra DCD User Guide for details). |
| Shut down old Apstra DCD server | If upgrading an Apstra DCD cluster, shut down old worker VMs after replacing them with new ones. |
| Roll back Apstra DCD Server, as needed |
Roll back to a previous Apstra DCD version, if needed. |