Unpack the HPE Third-Party Integrated ORv3 Rack
Unpack the third-party integrated ORv3 rack by following the recommended procedure and check that you have received all the components.
Unpack the Rack
For unpacking and parts lists of the liquid-cooled QFX5250-64OE-L model switch and EX4400 management switch, see How to Install QFX5250-64OE-L Switch in Third-Party Integrated ORv3 Rack and How to Install EX4400 Management Switch with Tray Assembly (1OU) in HPE Third-Party Integrated ORv3 Rack.
The third-party integrated ORv3 rack is shipped fully assembled and enclosed within a protective, international heat-treated RNS crate that is designed for transportation and handling. Unpack the rack only after it has been moved to its final installation location and commissioning activities are ready to begin.
The shipping crate provides protection against damage during transportation, handling, and storage. Prematurely unpacking the rack may expose it to damage. Do not remove the rack from its crate until it is ready to be positioned and commissioned at the installation site.
The shipping crate for the HPE third-party integrated rack includes an integrated ramp designed to facilitate rack removal and positioning. Use the ramp when moving the rack from the shipping pallet to its installation location.
To unpack the device:
Move the crated rack to a staging area as close to the final installation location as possible while ensuring sufficient clearance for crate removal and rack movement.
Position the crate on a stable, level surface and verify that all orientation markings on the crate indicate the correct upright position.
Inspect the crate for signs of shipping damage before opening it.
Remove the fasteners, panels, and protective coverings securing the crate according to the instructions provided with the shipping container.
Remove all internal packaging materials, shipping restraints, and protective components used to secure the rack and associated accessories during transport.
Verify the parts received against the list in Packing List for the Third-Party Integrated ORv3 Rack.
Inspect the rack, accessories, and associated components for visible signs of damage that may have occurred during shipping or handling.
Retain the crate, packaging materials, and shipping hardware for possible future transportation, storage, or return shipment of the rack.
The rack is a heavy, fully assembled system. Use appropriate lifting, handling, and personnel-safety procedures when removing the rack from the shipping crate and moving it within the installation site.
Packing List for the Third-Party Integrated ORv3 Rack
The shipment includes a packing list. Check the parts you receive in the crate against the items on the packing list. We ship the parts as per the configuration that you order.
If any part on the packing list is missing, contact your customer service representative or contact HPE customer care . See https://support.hpe.com/.
-
If multiple power shelves are installed in the same ORv3 rack, all power shelves must be of the same type and specification. Mixing different power-shelf types within the same ORv3 rack is not supported.
-
In a typical deployment, each power shelf is connected to facility power using an AC power whip. Power whips are not supplied as part of the HPE third-party integrated rack solution. You must procure power whips that are compatible with the available facility power connections and power infrastructure.
-
In-rack or in-row CDUs are not supplied as part of the HPE third- party integrated rack solution.
| Component | Part Number | Minimum Quantity (Single Rack) |
|---|---|---|
|
ORv3 rack (includes left and right side panels) |
S8W94A |
1 |
|
International heat-treated RNS crate |
S8W95A |
1 |
|
Liquid-cooled manifold |
S8W96A |
1 |
|
ORv3 rack mounting rail kit (1 OU) |
S8W97A |
18 |
|
19-in. to 21-in. power shelf adapter kit (1 OU) |
S8W98A |
3 |
|
DC busbar (72 kW) |
S6V60A |
1 |
|
19-in., 33-kW power shelf with six 5.5-kW PSUs and one power controller |
S6E21A |
3 |