Ground the HPE Third-Party Integrated ORv3 Rack

Use the information in this topic to ground the third-party integrated ORv3 rack.

Before connecting facility power to the rack, connect the rack frame to the protective-earth grounding system of the facility.

CAUTION:

Do not connect the rack to power until the rack frame has been connected to the facility's protective-earth grounding system. Operating the rack without a proper earth-ground connection can result in equipment damage and may create an electrical safety hazard.

To ground the third-party integrated ORv3 rack:

Note:

Follow all site-specific grounding requirements, local electrical codes, and data center installation practices when grounding the rack.

  1. Ensure that the rack has been moved to its final installation location and that the levelers have been lowered to stabilize the rack.
  2. Connect the rack frame to the facility protective-earth grounding system in accordance with applicable ORv3 rack-grounding requirements, local electrical codes, and site installation practices.
  3. Verify that the grounding connection is complete and secure before connecting facility power to the power shelves or powering on any rack components.